Article 19
Articles 19 & 20 · Law 4936/2022
Are you required to report under Article 19 or 20?
Answer 6 short questions and see right away whether Article 19, Article 20 or both apply to you.
- Up-to-date thresholds and permit categories
- Article 19 (installation) and Article 20 (company) kept separate
- Instant result, no sign-up
Checking for a client? The check works the same way.
This check is for information only and is not an official legal or administrative opinion. Whether Articles 19 and 20 of Law 4936/2022 apply is finally determined by the competent authority.
Law 4936/2022
Two articles,
two different obligations.
Article 19 is about the installation, Article 20 about the company. Not every company is required to report.
Article 20
Obligated legal entities
01Who is required to submit an emissions report?
Installations with a category A1 or A2 environmental permit (Article 19) and certain categories of companies at organisation level (Article 20). The check above shows whether it applies to you.
02What is the submission deadline?
The report is submitted every year by 31 October and covers the previous year’s data. For 2026, the deadline is 31 October 2027.
03Does the report need verification?
Yes. The report is verified by an accredited verifier before submission.
04What is the difference between Article 19 and Article 20?
Article 19 covers a single installation and includes a reduction target for 2030. Article 20 covers the whole organisation, with all its installations.
05Can a consultant help me?
Yes. Most entities work with a consultant. In ClimateTrack the consultant works with you on the same report.
Demo
From invoices to submission, on one platform.
In 30 minutes we show you how your report is organised, using your own data.
- Scope 1 & 2 calculation with the Ministry's emission factors
- A ready-to-go file for verification and submission
- Entity, consultant and verifier working together
Or book a demo by filling in the form.